Article may be outdated

This article is 50 days old. Some details may have changed since publication.

Philstar.com·3 min read·medium

Visayas Grid on extended red alert

Visayas Grid on extended red alert
✦AI Summary

The Visayas Grid in the Philippines is under an extended red alert due to a significant power supply deficit, leading to rotational brownouts. The shortage is caused by the unavailability of several major coal-fired power plants and limited energy imports from Mindanao.

Why it matters

Recurring power grid instability in the Visayas region threatens local economic activity and highlights the vulnerability of relying on aging energy infrastructure.

✦Dive DeeperCreate a free account to unlock

CEBU, Philippines - The Visayas Grid was placed under an extended red alert on Tuesday, August 11, resulting in rotational brownouts and manual load dropping across several distribution utilities, including Cebu City.

The National Grid Corporation of the Philippines (NGCP) reported that the Visayas Grid had only 2,123 megawatts (MW) of available capacity against a projected peak demand of 2,418 MW, leaving a deficit of nearly 300 MW.

The red alert was declared from 3 p.m. to 8 p.m., with yellow alert periods from 1 p.m. to 3 p.m. and again from 8 p.m. to 10 p.m.

For Cebu City residents, the alert meant possible power interruptions in areas served by the Visayan Electric (VECO), which supplies electricity to Cebu City and neighboring municipalities.

NGCP identified VECO and other distribution utilities for potential MLD between 1 p.m. and 10 p.m.

Continue reading on Headlinne

Create a free account to read the full article.

Read full article →
environmenteconomyscience
✦

Get smarter about the news

Sign up free for a feed built around what you actually care about, Dive Deeper research on any story, and the full text of every article.

Create free account

Already have an account? Sign in