Article may be outdated

This article is 3 days old. Some details may have changed since publication.

Times of India·3 min read·medium

Six years overdue, Army begins first full overhaul of indigenous Arjun tanks

D
DHRUV YADAV
Six years overdue, Army begins first full overhaul of indigenous Arjun tanks
AI Summary

The Indian Army has begun the first full overhaul of its Arjun Mk-1 tanks after a six-year delay. The project includes significant upgrades to firepower and mobility, serving as a pilot for the rest of the fleet.

Why it matters

The overhaul addresses long-standing maintenance and operational readiness issues for India's indigenous armored capabilities.

Dive DeeperCreate a free account to unlock

Six years behind schedule, the Army has finally kicked off the rebuild of its Arjun tanks, with two Mk-1s set to be stripped down and refurbished at the Heavy Vehicles Factory in Avadi. The two tanks will also get 26 upgrades borrowed from the newer Mk-1A variant and will serve as a pilot for the overhaul of the Army's remaining 124-strong fleet. The repair procedures developed here will form the template going forward.The Arjun has never had a full overhaul before. A 2016 CAG report flagged that the tank, inducted from 2004, was due for its first overhaul by 2020, but no agency had even been identified to carry it out. The same audit found the Arjun sitting idle since 2013 due to a lack of repair facilities and poor spares support from HVF.

Continue reading on Headlinne

Create a free account to read the full article.

Read full article →
technologyworldbusiness

Get smarter about the news

Sign up free for a feed built around what you actually care about, Dive Deeper research on any story, and the full text of every article.

Create free account

Already have an account? Sign in