Article may be outdated

This article is 57 days old. Some details may have changed since publication.

The Hindu·3 min read·hard

Silt fills almost half the storage in Kerala’s Malankara dam causing capacity crisis

S
Sandeep Vellaram
Silt fills almost half the storage in Kerala’s Malankara dam causing capacity crisis
✦AI Summary

The Malankara dam in Kerala is facing a capacity crisis as nearly half of its reservoir is filled with silt. Officials are coordinating with the KSEB to manage water levels and prevent flooding, while planning for a major desilting project.

Why it matters

Reservoir siltation significantly reduces water storage capacity, complicating flood management and irrigation efforts during monsoon seasons.

✦Dive DeeperCreate a free account to unlock

Nearly half of the storage capacity of the Malankara dam in Idukki, part of the Muvattupuzha Valley Irrigation Project (MVIP), is filled with silt, severely reducing its volume. The full reservoir level of the dam is 42 m.

According to officials, a 2021 study conducted by the Kerala Engineering Research Institute (KERI) found that silt occupied 48.95% of the reservoir’s total storage capacity. Due to this reduced capacity, MVIP officials are facing a serious crisis in managing water storage and preventing flooding in the Thodupuzha and Muvattupuzha rivers.

“The Malankara dam primarily stores tailrace water released from the Moolamattom powerhouse after electricity generation at the Idukki reservoir. With the Malankara shutters wide open, this water flows directly downstream into the Thodupuzha river and then to the Muvattupuzha river,” said an MVIP official.

Continue reading on Headlinne

Create a free account to read the full article.

Read full article →
environmenteconomy
✦

Get smarter about the news

Sign up free for a feed built around what you actually care about, Dive Deeper research on any story, and the full text of every article.

Create free account

Already have an account? Sign in