The Star·4 min read·medium

Putting the ECRL to the test

M
MENG YEW CHOONG
Putting the ECRL to the test
AI Summary

A specialized Comprehensive Inspection Train (CIT) is being used to test the East Coast Rail Link (ECRL) infrastructure in Malaysia. The equipment measures track geometry and signaling systems to ensure safety before the line's scheduled opening.

Why it matters

The ECRL is a major infrastructure project, and rigorous testing is essential for the safety and reliability of future high-speed rail operations.

Dive DeeperCreate a free account to unlock

PETALING JAYA: A multi-million-ringgit piece of equipment has been deployed to speed up inspections ahead of the East Coast Rail Link (ECRL) opening.

Known as the comprehensive inspection train (CIT), it is fitted with an array of sensors to measure parameters related to track engineering, traction power supply as well as the signalling and communication system.

Things that are measured by the array of sensors and cameras mounted on the equipment include track geometry and rail profile, the quality of physical contact between the train and the overhead power lines through the pantograph, as well as the quality of 4G LTE coverage along the alignment to support safe and reliable operations and signalling.

The CIT, which resembles a regular passenger train, has been in operation since Aug 21 as part of system integration testing, which assesses the integration and coordination of key railway systems and their interfaces.

Continue reading on Headlinne

Create a free account to read the full article.

Read full article →
technologyeconomy

Get smarter about the news

Sign up free for a feed built around what you actually care about, Dive Deeper research on any story, and the full text of every article.

Create free account

Already have an account? Sign in