Ondipudur residents protest, seek early start to railway overbridge work

Residents of Sivalingapuram in Coimbatore staged a protest demanding the acceleration of a long-pending railway overbridge project. They urged the local corporation to shift underground drainage works and remove encroachments that have stalled the project for nearly 15 years.
Why it matters
This reflects common urban infrastructure challenges in India where bureaucratic delays and land disputes significantly impact public convenience and development.
Residents of Sivalingapuram in Ondipudur staged a protest at the Coimbatore Corporation’s East Zone office in Singanallur on Monday, demanding that underground drainage (UGD) works at the proposed site be shifted to facilitate the construction of a railway overbridge (ROB) at Level Crossing No. 3 at Surya Nagar.
Led by members of the Sivalingapuram Residents Welfare Association, the residents staged a protest at the office for several hours as officials arrived late. They urged the Corporation to expedite the long-pending ROB project and remove encroachments along the approach road.
The residents said a government order for constructing the ROB in Ward 56 of Ondipudur was issued on December 7, 2011. The road was handed over to the Highways Department through a Corporation resolution on June 1, 2012, but the resolution was subsequently cancelled in April 2013.
Get smarter about the news
Sign up free for a feed built around what you actually care about, Dive Deeper research on any story, and the full text of every article.
Create free accountAlready have an account? Sign in