Article may be outdated

This article is 3 days old. Some details may have changed since publication.

The Hindu·3 min read·medium

Indian tunnel rescue team makes progress at Chilime, Langtang hydropower sites

P
PTI
Indian tunnel rescue team makes progress at Chilime, Langtang hydropower sites
AI Summary

Indian rescue teams are assisting Nepal in recovery efforts following devastating flash floods that occurred in late August 2026. The teams are specifically focused on probing tunnels at hydropower sites in Chilime and Langtang to locate missing workers.

Why it matters

This highlights regional cooperation and disaster response efforts between India and Nepal during a significant humanitarian crisis.

Dive DeeperCreate a free account to unlock

India's specialised tunnel rescue team made progress at two hydropower sites in flood-hit Nepal , establishing a foothold inside a tunnel at Chilime and probing up to 185 metres at Langtang, the Indian envoy in Kathmandu has said.

Follow the updates of the Nepal flash floods on September 1, 2026.

The team worked at the Chilime and Langtang sites in coordination with the Nepali Army despite inclement weather and difficult access conditions, Indian Ambassador to Nepal Naveen Srivastava said in a post on X on Monday (August 31, 2026).

India has deployed specialised teams to assist Nepal following the devastating flash floods of August 26, which swept through northern and central parts of the country, killing hundreds, leaving thousands missing and destroying homes, roads and bridges and hydropower projects.

Continue reading on Headlinne

Create a free account to read the full article.

Read full article →
worldenvironment

Get smarter about the news

Sign up free for a feed built around what you actually care about, Dive Deeper research on any story, and the full text of every article.

Create free account

Already have an account? Sign in