Grid bottlenecks hamper green energy expansion
India's rapid renewable energy expansion is facing significant operational risks due to inadequate transmission infrastructure. Energy think-tank Ember reports that grid bottlenecks caused two-thirds of renewable energy curtailment in early 2026, highlighting a critical need for better integrated planning.
Why it matters
As India pushes for green energy, the inability to transmit power from generation sites to the grid threatens the viability of large-scale solar and wind projects.
Grid bottlenecks hamper green energy expansion | India News - The Times of India
The article relies on data from an energy think-tank and government statements to report on infrastructure challenges without taking a political stance.
Get smarter about the news
Sign up free for a feed built around what you actually care about, Dive Deeper research on any story, and the full text of every article.
Create free accountAlready have an account? Sign in