From roadbed to economic transformation: SGR lays the track for Tanzania’s Vision 2050

Tanzania is advancing the construction of the Standard Gauge Railway (SGR) with ongoing roadbed preparation in the Makutupora-Tabora section. The project is a key component of the nation's Vision 2050 economic transformation strategy.
Why it matters
Large-scale infrastructure projects are critical for economic development and regional connectivity in East Africa.
TABORA: IN Nyaua Village, the sound of excavators, bulldozers and graders signals another stage in Tanzania’s construction of the Standard Gauge Railway (SGR), where engineers are preparing and testing the ground before building the next layers of the railway.
The work is taking place on Lot Three of the SGR project, which covers the Makutupora-Tabora section.
According to Tanzania Railways Corporation (TRC), the section is 368 kilometres long, comprising 294 kilometres of main line and 74 kilometres of passing loops, with a construction contract worth 1.908 billion US dollars, equivalent to 4.406tri/-.
Get smarter about the news
Sign up free for a feed built around what you actually care about, Dive Deeper research on any story, and the full text of every article.
Create free accountAlready have an account? Sign in