Article may be outdated

This article is 70 days old. Some details may have changed since publication.

The Straits Times·2 min read·easy

CTE closures for PIE bridge works

A
Ann Neo
CTE closures for PIE bridge works
✦AI Summary

The Urban Redevelopment Authority announced temporary closures of two CTE exits in Singapore from July 28 to 31 for bridge construction. The project aims to improve cycling and pedestrian connectivity between Potong Pasir and Bendemeer.

Why it matters

Provides necessary traffic advisory for local commuters to plan alternative routes during construction.

✦Dive DeeperCreate a free account to unlock

The city-bound CTE Exit 8A towards PIE in the direction of Tuas will be closed from midnight to 5am on four days in July.

Listen Summarise Two city-bound CTE exits will close from July 28 to 31, from midnight to 5am, for bridge launching works on a pedestrian and cycling link across the PIE. Motorists are advised to use alternative exits and routes, with barricades and signs in place to guide them safely. The new nearly 700m PIE bridge will enhance connectivity between Potong Pasir and Bendemeer, enabling cyclists to reach the city centre in under 30 minutes by late 2027. AI generated

SINGAPORE – Two exits on the CTE towards the city will be closed during the early hours of selected days in July, as there will be bridge launching works for the new pedestrian and cycling link across the PIE.

Continue reading on Headlinne

Create a free account to read the full article.

Read full article →
businesstravel
✦

Get smarter about the news

Sign up free for a feed built around what you actually care about, Dive Deeper research on any story, and the full text of every article.

Create free account

Already have an account? Sign in