Article may be outdated

This article is 54 days old. Some details may have changed since publication.

The Hindu·2 min read·medium

Coimbatore Corporation earmarks additional ₹3.6 crore for Ukkadam bus terminus works

T
The Hindu Bureau
Coimbatore Corporation earmarks additional ₹3.6 crore for Ukkadam bus terminus works
✦AI Summary

The Coimbatore Corporation has allocated an additional ₹3.6 crore for concrete road works at the Ukkadam bus terminus. The extra funding is required due to rising material costs and the need for reinforced pavement to support heavy bus traffic on soft soil.

Why it matters

Infrastructure projects often face budget overruns due to site-specific engineering challenges, impacting municipal financial planning.

✦Dive DeeperCreate a free account to unlock

An additional ₹3.6 crore has been earmarked for concrete road works at the under-construction second terminal of the Ukkadam bus terminus in Coimbatore, taking the project cost beyond the original estimate.

The Coimbatore Corporation had awarded the project for the twin bus terminus at Ukkadam at an estimated cost of ₹21.55 crore. Of this, Terminal-1 was constructed at a cost of about ₹13 crore and opened before the Assembly elections. The remaining ₹8.55 crore was allocated for Terminal-2.

Continue reading on Headlinne

Create a free account to read the full article.

Read full article →
businesseconomy
✦

Get smarter about the news

Sign up free for a feed built around what you actually care about, Dive Deeper research on any story, and the full text of every article.

Create free account

Already have an account? Sign in