Article may be outdated

This article is 53 days old. Some details may have changed since publication.

The Hindu·3 min read·medium

CMRL’s phase 2 corridor cuts through roof of MRTS station at Adambakkam

S
Sunitha Sekar
CMRL’s phase 2 corridor cuts through roof of MRTS station at Adambakkam
✦AI Summary

Chennai Metro Rail Limited (CMRL) has designed a section of its phase 2 corridor to pass directly through the roof of the existing Adambakkam MRTS station. This unconventional engineering choice was made to avoid displacing local residents and to navigate complex urban infrastructure.

Why it matters

It illustrates the engineering challenges and trade-offs involved in expanding public transit infrastructure within densely populated urban environments.

✦Dive DeeperCreate a free account to unlock

In what could be an unconventional alignment, Chennai Metro Rail Limited’s (CMRL) corridor 5 line will cut through the Adambakkam MRTS station’s roof.

A part of the phase 2 network, corridor 5 runs from Madhavaram to Sholinganallur via Retteri, Kolathur, Villivakkam, Anna Nagar West, Thirumangalam, Koyambedu, Virugambakkam, Mugalivakkam, Ramapuram, Manapakkam, Chennai Trade Centre, Adambakkam, Ullagaram, Madipakkam, Kovilambakkam, Medavakkam, and Perumbakkam.

The alignment runs over the cloverleaf flyover and phase 1 corridor at Alandur, and passes through Railway Station Road and St. Thomas Mount. Then, it travels parallel to the MRTS corridor at Adambakkam and cuts through the Adambakkam MRTS station roof, before proceeding towards Vanuvampet.

Continue reading on Headlinne

Create a free account to read the full article.

Read full article →
technologybusiness
✦

Get smarter about the news

Sign up free for a feed built around what you actually care about, Dive Deeper research on any story, and the full text of every article.

Create free account

Already have an account? Sign in