NDTV·2 min read·medium

93 Workers Disappeared Inside Nepal Tunnel. Thermal Drones Found Nothing

R
Ranveer Singh, Samiran Mishra
93 Workers Disappeared Inside Nepal Tunnel. Thermal Drones Found Nothing
AI Summary

Rescue teams in Nepal used thermal drones to search a hydropower tunnel for 93 missing workers following devastating floods. The search concluded with no survivors found, as the death toll from the regional flooding continues to rise.

Why it matters

The incident underscores the catastrophic impact of extreme weather on infrastructure and the high human cost of natural disasters in the Himalayas.

Dive DeeperCreate a free account to unlock

Rescuers searching a flood-hit hydropower project in Nepal reached the far end of a tunnel using thermal drones but found no survivors. At least 93 workers were feared trapped in the Rasuwagadhi Hydropower Project tunnel in Rasuwa district and now remain untraceable. The operation at Rasuwagadhi involved Nepali Army personnel, engineers and a drone team. The rescuers entered the tunnel after flooding in the Bhote Koshi river raised fears that workers could have been stranded at its far end.93 Workers Disappeared Inside Nepal Tunnel. Thermal Drones Found Nothing https://t.co/1nPZt4iDYJ pic.twitter.com/hswRNWakAa - NDTV (@ndtv) August 31, 2026The team managed to reach the endpoint and used drones to search the interior, including areas that would have been difficult or dangerous to inspect directly. But there was no indication that anyone was inside.The Prime Minister's Secretariat said on Monday that the Army-led team had returned after searching the tunnel of the 111-megawatt Rasuwagadhi project.Once the drone team found that there was no one in the tunnel, the search was abandoned and the rescuers returned to Dhunche in Rasuwa district. Hundreds of workers were underground in several hydropower projects in Nepal when floodwaters ravaged the country, killing hundreds. In several locations rescuers struggled to establish whether those reported missing are trapped inside tunnels, have escaped to higher ground, or have been carried away by the floods.Nepal's National Disaster Risk Reduction and Management Authority (NDRRMA) said on Monday that 933 people associated with hydropower projects were missing.Rescuers have so far brought 279 people out of hydropower tunnels. That includes 254 people rescued from the Upper Trishuli-1 project and another 18 from the Langtang Khola site. 

Continue reading on Headlinne

Create a free account to read the full article.

Read full article →
worldenvironmentscience
Political Bias
Center
LeftLean LCenterLean RRight
Confidence: 90%

The report relies on official statements from the Prime Minister's Secretariat and disaster management authorities.

Get smarter about the news

Sign up free for a feed built around what you actually care about, Dive Deeper research on any story, and the full text of every article.

Create free account

Already have an account? Sign in