$4.4bn cleanup turns Ohio’s Fernald uranium site into wetlands and forest
A $4.4 billion cleanup project has successfully transformed a former uranium production site in Ohio into the Fernald Preserve. The site, which once supported nuclear weapons production, now features wetlands, forests, and public trails.
Why it matters
It serves as a significant case study in large-scale environmental remediation and the repurposing of industrial brownfields for public ecological use.
For nearly four decades, a site in Ohio was part of the United States’ nuclear weapons production programme. Today, the same land has been turned into the Fernald Preserve, with wetlands, prairies, forests, walking trails and a Visitors Center that tells the story of its past.According to US Energy department, its Fernald property, located northwest of Cincinnati, once housed the Feed Materials Production Center. The facility produced high-grade uranium metal products and served as the first link in America’s nuclear weapons production cycle. Uranium production at the site ended in 1989, after which its mission changed from production to environmental cleanup.What followed was a massive effort to remove radioactive and other contaminated material from the site. The cleanup cost $4.4 billion and involved work such as sampling, analysing contamination, demolishing buildings, removing waste and treating contaminated groundwater.
Get smarter about the news
Sign up free for a feed built around what you actually care about, Dive Deeper research on any story, and the full text of every article.
Create free accountAlready have an account? Sign in